Part of the suspended ceiling is finished, and then the HVAC duct turns out to cross the fire protection main or the cable route. Suddenly the job means dismantling, reinstalling, extra labour hours and a possible delay to handover. The problem is not a pipe in the wrong place; it is a clash that was never resolved before it reached site.
This article covers MEP coordination, the role of shop drawings and clash detection in preventing that problem. It is written for project owners, consultants, project managers, construction managers and technical offices. It looks at why clashes happen and what they cost, the difference between drawing types, a recommended coordination method, and how to assess a contractor's ability to coordinate, then explains where Van Tech fits in.