Back to Portfolio

Banking & Finance
• Egypt
Qatar National Bank Egypt – Premium Branch MEP & Fire Suppression Systems | Van TechQatar National Bank MEP contracting projects and engineering case study
13Total Projects
102Engineering Months
1Countries
SEO TagsQNB Egypt branch MEPQatar National Bank HVACbank branch fire suppression EgyptFM200 banking MEPQNB fit-out contractor Egyptbanking MEP solutions
Partnership Insights
Qatar National Bank (QNB) is one of the largest and most trusted banks across the Middle East and Africa. In Egypt, the bank operates an expanding branch network across Greater Cairo and new urban cities. Van Tech was selected as the specialized MEP partner to deliver mechanical, electrical, and fire protection systems across 13 branches to the bank's stringent quality standards.
The scope across each branch included: central HVAC systems tailored for banking environments, FM200 fire suppression protecting server rooms and vaults, early warning fire alarm systems, and electrical power distribution. Project durations ranged from 3 months for compact branches to 18 months for large-scale projects like the 10th of Ramadan branch. All systems were commissioned in full compliance with QNB's technical and security requirements.
The banking environment imposed exceptional challenges: server rooms and vaults demanded precision cooling and water-free gaseous suppression systems to protect digital and physical assets. QNB management required all works to be executed outside official banking hours to maintain uninterrupted customer service. We overcame these constraints through night-shift schedules and disciplined on-site teams.
All 13 QNB branches were handed over passing every commissioning and testing protocol on the first attempt. Van Tech maintained a zero-defect record throughout the warranty period across all branches. The longest execution was 18 months for the 10th of Ramadan branch—one of QNB Egypt's largest. This achievement cemented the bank's confidence in Van Tech as a trusted banking MEP partner.
The banking sector demands an exceptional level of precision and adherence to security standards. Van Tech holds deep expertise in precision cooling systems and gaseous suppression solutions tailored for server rooms and bank vaults. Our single-team integrated approach ensures operational confidentiality and full compliance with Central Bank of Egypt requirements. This is why QNB and other major banks trust Van Tech.
Delivered Projects
QNB Bank – Sun City Mall Heliopolis Branch
Completed
Sun City Mall, Heliopolis, Cairo 4 Months 🇪🇬
QNB Bank – El-Shrouk Branch
Completed
El-Shrouk City, Cairo 5 Months 🇪🇬
QNB Bank – New Cairo Branch
Completed
New Cairo, Cairo 8 Months 🇪🇬
QNB Bank – El-Sabaa Branch (Main)
Completed
El-Sabaa, Cairo 15 Months 🇪🇬
QNB Bank – El-Abour Branch
Completed
El-Obour City, Qalyubia 8 Months 🇪🇬
QNB Bank – 10th of Ramadan Branch (Main)
Completed
10th of Ramadan City, Sharqia 18 Months 🇪🇬
QNB Bank – Dandy Mall Branch
Completed
Dandy Mall, 6th of October City 6 Months 🇪🇬
QNB Bank – Naval Academy Sheraton Branch
Completed
Naval Academy Area, Sheraton, Cairo 4 Months 🇪🇬
QNB Bank – El-Sabaa Branch (Phase 2)
Completed
El-Sabaa, Cairo 6 Months 🇪🇬
QNB Bank – 10th of Ramadan Branch (Express)
Completed
10th of Ramadan City, Sharqia 3 Months 🇪🇬
QNB Bank – El-Abour Branch (Main)
Completed
El-Obour City, Qalyubia 12 Months 🇪🇬
QNB Bank – Madinty Branch (Express)
Completed
Madinty, New Cairo 3 Months 🇪🇬
QNB Bank – Madinty Branch (Main)
Completed
Madinty, New Cairo 10 Months 🇪🇬

